Turn Depreciation Report Recommendations into a Contractor Scope

Architectural drawings, a pen and reading glasses on a table

Turn Depreciation Report Recommendations into a Contractor Scope

Your strata’s depreciation report identifies a building component for future repair or replacement. Council is ready to explore the work, but contractors need more detail before they can prepare comparable proposals.

The next step is to develop a project scope that describes the current problem, intended outcome and boundaries of the work. A useful scope also identifies decisions that still need investigation or professional input.

Start With the Specific Recommendation

Pull out the relevant component description, observations, suggested timing and assumptions from the report. Gather related inspection records, maintenance history, photographs and previous repair information.

Ask a straightforward question: what does the strata want the proposed project to accomplish?

The answer should be specific enough to guide the next discussion. For example, identify the building area and reported concern rather than asking contractors to price a broad category such as “exterior repairs.”

Keep the original report reference attached so everyone can see where the project discussion began.

Confirm Current Conditions

Before requesting firm construction pricing, ask what information needs updating. Identify which conditions can be reviewed during a site visit and which may require testing, exploratory work or specialist assessment.

Record unanswered questions instead of allowing each bidder to make a different assumption. If the project requires consultant drawings or specifications, clarify who will arrange them and when they will be available.

This creates a clearer basis for pricing and helps council understand which parts of the proposal are confirmed.

Define the Work Boundaries

A contractor scope should identify where the work begins and ends. Name the building areas, components and interfaces included in the project.

For work that affects adjoining finishes, ask who is responsible for removal, protection and reinstatement. Clarify responsibilities for access equipment, waste removal, resident coordination and making good after construction.

Include exclusions in the same discussion. An item left outside the contract still needs an owner if it is necessary to complete the overall project.

Give Contractors Consistent Information

Prepare one package for all bidders, with the same scope, drawings, photographs and site information. Set a process for questions and circulate relevant answers consistently.

If the scope changes, issue a dated revision and ask contractors to identify the version used in their proposals.

Request a separate explanation of allowances, optional work and unresolved quantities. Council can then compare the base scope while seeing where final costs depend on later decisions.

Record Decisions Before Work Starts

Before proceeding, bring the selected proposal, clarifications and accepted changes together in the contract documents. Confirm the approval process for additional work and identify the person authorized to give instructions.

Keep funding decisions, project approvals and construction instructions clearly recorded. A shared record helps the council, property manager and contractor work from the same expectations.