We carry out Kitec plumbing repiping in Surrey for homeowners, strata, and multi unit properties. Our team replaces outdated systems with modern piping that helps reduce risk and improve long term reliability.
We’re here to help! Make sure to provide detailed information about your needs. Our team will be in touch within 48 hours.
Kitec plumbing was widely installed in many Surrey properties and is now known for its failure risk as systems age. Leaks can develop without much warning, leading to damage inside walls, ceilings, and flooring. For many property owners, repiping has become a necessary step to prevent future issues.
We handle the process with careful planning and a clear scope of work. Each project is assessed based on layout and access, allowing us to carry out the replacement efficiently. Our focus is on completing the work in a way that restores confidence in the building’s plumbing system.
Review visible pipe markings, fittings, routing, mechanical spaces, risers, and representative suites to define whether Poly-B, Kitec, or a mixed condition is present.
Coordinate notices, suite entry, water shutdowns, daily work zones, and progress tracking so a large Surrey complex can move through manageable stages.
Plan wall and ceiling openings, repair affected finishes, test the new system, and organize deficiencies and records before completion.
Poly-B is commonly grey flexible pipe and may carry PB2110 markings. Kitec is often orange or blue and may show Kitec, IPEX, AQUA, or ASTM markings. Colour alone is not enough, so representative suites, mechanical rooms, fittings, and records should be reviewed.
A building-wide approach is usually easier to document and coordinate when the same piping system serves many units. The right phasing depends on riser layout, shutoff zones, access, occupied suites, and the approved scope.
Identify piping to be replaced, replacement materials, valves, fixture connections, testing, permits where required, unit access, water interruptions, protection, drywall and paint restoration, cleanup, and closeout records.
Many occupied strata projects can be sequenced so residents remain in place, but temporary water interruptions and scheduled suite access are expected. Individual needs, pets, and mobility concerns should be addressed early.
Duration depends on the number of units, risers, building type, working hours, access reliability, and restoration scope. A site review is needed before a realistic schedule can be prepared.