Many Chilliwack properties still have Kitec plumbing systems that were installed years ago. As these systems age, they become more likely to develop leaks and hidden issues. Replacing the piping helps reduce the risk of water damage and ongoing repairs.
We approach each project with a practical plan based on the layout of the building. Our team coordinates the work carefully to keep the process organized and efficient. The goal is to complete the replacement with minimal disruption while delivering a reliable plumbing system.
Review common mains, building feeds, crawlspaces, ceilings, valves, and unit branches to document Poly-B or Kitec extent.
Coordinate residents, keys, parking, material staging, shutdown notices, and daily work areas across rows or separate buildings.
Apply defined drywall and paint limits, test new lines, log unit completion, and resolve deficiencies before final records.
No. They have different colours, markings, fittings, and installation histories. Identification should consider labels and connections in several locations.
Crew travel, separate shutdown zones, material staging, repeated setup, and the number of layouts can all affect production.
Accessible routes may change where work occurs, but do not automatically eliminate openings. Connections and safe access still need review.
The communication plan should define reminders, key procedures, missed-access escalation, and rescheduling.
After the zone is connected, tested, inspected where required, and water service is restored. Residents should receive confirmation.